Customization: | Available |
---|---|
Media: | Water |
Material: | Bronze |
Still deciding? Get samples of US$ 30/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Lead free bronze water meter accessories Cu 83%-86%
Bronze Water Meter Accessories,bronze ball valve for flow meter ,bronze ball valve,bronze nipple,bronze expansionMaterial |
Bronze Body, Bronze Bonnet, brass ball, bronze handle Bronze can be C83600,C84400,C89833 |
Surface |
Natural bronze or Nickel plated |
Size |
1/2" To 1" |
Testing Pressure |
100% tested with 0.6MPa - 0.8MPa by air. |
Suitable medium | Water, no-causticity liquid, and gas |
Working temperature | -20 to 120° C |
Thread |
Compression end and BSP & NPT Female x female or MalexM,FxM for selecting |
Samples Time |
1) 2 days - For our existing samples for reference 2) 30 days - If new size, need make the new mould |
OEM Acceptable |
Yes |
Production Capacity |
100,000 pcs each month |
Packing Details |
Poly bag, inner box, out carton and pallet. |
Payment Term |
T/T ,L/C,WESTERN UNION |
Delivery Time |
30 days to 40 days after confirming all details |
Minimum Order Quantity |
500-2000 Pieces |
Material |
Brass Body, Brass Bonnet, brass ball, steel handle Brass can be CZ132,CZ122,CW602,CW617N,C36000, DZR, etc |
Surface |
Natural brass or Nickel plated |
Size |
1/2" To 2" |
Testing Pressure |
100% tested with 0.6MPa - 0.8MPa by air. |
Suitable medium | Water, no-causticity liquid, and gas |
Working temperature | -20 to 120° C |
Thread |
Compression end and BSP & NPT Female x female or MalexM,FxM for selecting |
Samples Time |
1) 2 days - For our existing samples for reference 2) 30 days - If new size, need make the new mould |
OEM Acceptable |
Yes |
Production Capacity |
50000pcs each month |
Packing Details |
Poly bag, inner box, out carton and pallet. |
Payment Term |
T/T ,L/C,WESTERN UNION |
Delivery Time |
30 days to 40 days after confirming all details |
Minimum Order Quantity |
500-2000 Pieces |